Skip to the tool
Epoxy Floor Cost Calculator

Installed cost

What this floor costs, built from real quantities

Every quantity on this page was derived from your slab. Every unit price was supplied by you. That split is the whole design: how many gallons, how many machine hours and how many rental days are questions with real answers, and what a gallon or an hour costs where you live is a question we have no honest source for and refuse to invent.

What the material costs where you can buy it
USD

Read it off the product page for the kit whose mixed volume you entered on the takeoff.

USD
USD
USD

Quantity comes from the repair takeoff; the price is yours.

What preparation costs where you are
USD
USD

Billed apart from the machine on almost every rental, and left out of almost every estimate.

USD
USD

What you are being charged, or what an hour of your own weekend is worth to you.

h

Estimated total for this floor

$1,919

$4 per square foot across 440 square feet

Material $924
Preparation $427
Preparation share 22%
Total hours 13.7 h
Rental days 1
Per square foot $4

Planning range $1,574 to $2,591

The line items, with the quantity separated from the price

Read the fourth column. Anything marked "derived here" is a quantity this site worked out from your slab and can defend. Anything marked "your figure" is a local price we declined to guess at.

LineQuantityCostOriginBasis
Coating material4 kits (9.7 gal ordered)$760derived hereGallons derived from area, film build and volume solids; kit count derived from the kit size you entered.
Decorative flake18 lb$79derived hereBroadcast weight derived from area at our assumed partial-broadcast rate.
Crack, joint and spall repair materialas measured$85your figureVolume is derived on the repair page; the price of that volume is yours.
Preparation machine rental1 day$130derived hereDays derived from the derived preparation hours and your working day; the day rate is yours.
Diamond tooling or shotas quoted$110your figureAlmost always billed apart from the machine and almost always forgotten.
Preparation labour3.4 h$187derived hereHours derived from area, passes, edge band and access; the hourly rate is yours.
Mixing and application labour10.3 h$568derived hereHours derived from area, coat count, broadcast courses and perimeter; the hourly rate is yours.

Why preparation is usually the larger half

At the settings above, preparation is 22% of the total and material is 48%. That ratio surprises people, and it is the single most useful thing to understand before reading a quote.

Material scales with area and thickness, both of which are fixed by the job. Preparation scales with area, thickness, AND what is on the slab — and that last term is unbounded. A sealer adds a pass. An old coating adds two. Adhesive residue loads the tooling and has to come off in shallow repeated cuts. Each of those multiplies the machine hours over the whole floor.

Which is why the cheapest quote is usually the one that has decided to prepare less, and why the quote check asks what profile they are taking the slab to. Two contractors quoting the same product at the same thickness can differ by a factor of two on the bill and both be describing real work.

The range, and why it is asymmetric

The planning range runs from $1,574 to $2,591. The upside is wider than the downside on purpose: the ways this job gets cheaper are limited and known, while the ways it gets more expensive are open-ended and are usually discovered after the machine is already on the floor.

The commonest overrun is not a price change at all. It is a scope discovery — a sealer nobody knew about, a crack that opens up when it is chased, or a moisture reading that arrives after the material is bought.

One caution about the per-square-foot figure, because that is the number people copy out of a page like this one and apply to a different floor. It is this total divided by this area, and preparation does not scale with area alone: edge work is charged by perimeter, obstructions are dealt with one at a time, and getting the machine onto the slab is charged once whatever the size. Halve the area and the figure per square foot goes up rather than down. It is a result of this job, not a rate you can carry to the next one.

Not in this figure

Biggest swing factor Material. The film build drives it directly, and film build is set by what the floor has to survive rather than by preference.